Stretch tasks R093 TA3: Work Planning and Workflow
Quiz Challenge
A quiz game against four computer players, then short and long written answers.
- Quiz Blitz12 questions against the clock
- Quick Fire4 short answers
- Big Think2 long answers
About 20 minutes
This or That
Pixel the cat asks 8 questions. Each has two answers: pick the right one.
- Two answers to every question
- A fish treat for every right answer
- Streaks win Pixel shades, then a party hat
About 4 minutes
Memory Match
Flip the cards two at a time to match each term card to its meaning card.
- 12 cards: each term has a meaning
- One peek at every card
- Combo points for pairs found in a row
6 pairs, about 4 minutes
Sort It
Sort each statement into the right box, like the tick-box tables in the exam.
- 12 cards to sort into 3 boxes
- Drag a card, tap a box or press its number
- Combo points for cards sorted in a row
12 cards, about 4 minutes
The games need JavaScript. Every question is below, with the answers at the end.
Read the lesson: R093 TA3: Work Planning and Workflow
R093 TA3: Work Planning and Workflow: the questions
Quiz Challenge, round 1: Quiz Blitz
What is a dependency?
- A task that cannot start until another finishes
- A spare day in the plan
- A client sign off
- A piece of equipment
What is a milestone?
- A risk
- A file version
- A fixed checkpoint, often a client sign off
- A task's duration
What is spare time deliberately built into a plan for problems called?
What does a Gantt chart show?
- Tasks against time
- Screens and links
- Shots in order
- Colours and fonts
A plan that finishes exactly on the deadline has good contingency.
- True
- False
Which phase contains editing and grading?
- Production
- Distribution
- Post-production
- Pre-production
Which phase contains risk assessment and booking locations?
- Pre-production
- Production
- Post-production
- Review
Which file name follows good version control?
- new poster (copy).svg
- poster-v03-client-review.svg
- poster-final-final-2.svg
- poster.svg
What is the critical path?
- The chain of dependent tasks that sets the shortest project length
- The quickest route to a location
- The client's approval route
- The main navigation path
Which TWO are sensible contingency plans for an outdoor shoot?
Tick 2.
- A reserve date
- Working faster
- Hoping for sun
- Skipping the edit
- An indoor alternative
Why keep a backup in a second location?
- It is faster
- It saves space
- It is required by law
- One copy is not a backup
Which resource cannot be bought more of?
- Locations
- Time
- Equipment
- Software
Quiz Challenge, round 2: Quick Fire
Explain what a dependency is, using an example from a video project. [2 marks]
Explain why 'I would work faster' is not a contingency plan. [2 marks]
Give two rules of good version control and explain one of them. [2 marks]
Explain why skipping pre-production usually makes a project take longer. [2 marks]
Quiz Challenge, round 3: Big Think
A student is making a two-minute promotional video for a local gym in four weeks. Describe a work plan for the project, including tasks, dependencies, milestones and contingency. [6 marks]
Discuss the risks to a one-day outdoor photo shoot and the contingency plans a photographer should make. [6 marks]
This or That: tick the right answer
Can editing start before filming finishes?
- Yes: they are independent
- No: it depends on filming
What do overlapping bars on a Gantt chart mean?
- Tasks running in parallel
- A mistake in the plan
A client sign off is an example of what?
- A dependency
- A milestone
Testing and exporting happen in which phase?
- Post-production
- Production
Building the website happens in which phase?
- Production
- Pre-production
Should you name a file 'final'?
- Yes: it is finished
- No: use a version number
Contingency days: before the deadline or after it?
- Before it
- After it
Keep the layered working file, or only the export?
- Only the export
- Keep the layered file
Memory Match: match each term to its meaning
| Term | Meaning |
|---|---|
| A Dependency | 1 Dependent tasks setting the shortest length |
| B Milestone | 2 Bars of tasks against time |
| C Contingency | 3 Numbered saves that can be recovered |
| D Gantt chart | 4 A fixed checkpoint, often a sign off |
| E Critical path | 5 Cannot start until another task ends |
| F Version control | 6 Spare time or a plan B |
Sort It: tick one box in each row
Which phase does each task belong to?
| Statement | Pre-production | Production | Post-production |
|---|---|---|---|
| Photographing the products | |||
| Filming the scenes | |||
| Sourcing and licensing assets | |||
| Editing the footage | |||
| Exporting the final file | |||
| Writing the app's code | |||
| Writing the script | |||
| Recording the voiceover | |||
| Booking the location | |||
| Carrying out a risk assessment | |||
| Mixing the sound | |||
| Testing the product |
Answers
Round 1: Quiz Blitz
- A task that cannot start until another finishes You cannot edit footage that has not been shot.
- A fixed checkpoint, often a client sign off Milestones mark points the project must reach.
- contingency Contingency names a risk and what you would do instead.
- Tasks against time Overlapping bars run in parallel. Bars that follow each other are dependencies.
- False It has no contingency at all.
- Post-production Post-production happens after filming or capture.
- Pre-production Planning, research and booking all come first.
- poster-v03-client-review.svg Numbered versions sort correctly. Never use final.
- The chain of dependent tasks that sets the shortest project length A delay on the critical path delays the whole project.
- An indoor alternative; A reserve date Contingency is a named plan, not optimism.
- One copy is not a backup Versioned saves and an off site backup protect against corruption.
- Time People's availability is usually the real constraint too.
Round 2: Quick Fire
- A task that cannot start until another has finished
- An example, such as editing depending on filming
Model answerA dependency is a task that cannot start until another has finished. Editing depends on filming, because you cannot edit footage that has not been shot, and filming depends on the location being booked.
- Contingency names a specific risk and an alternative
- With spare time built into the plan
Model answerContingency names a specific risk, such as equipment failure, and the alternative you would use instead, such as a spare camera. It also puts spare time into the plan before the deadline; working faster is just optimism, with nothing planned.
- Save a new numbered version at each stage
- Never use final, keep layered files, or back up elsewhere
- So an earlier state can be recovered
Model answerSave a new numbered version at each significant stage, such as poster-v03, and keep a backup in a second location. Numbered versions mean an earlier state can be recovered if a change goes wrong or a file is corrupted.
- Skipped decisions are made later, with less information
- Work already built has to be redone
Model answerEvery decision skipped in pre-production still has to be made, but later, with less information and with more work already built on top of it. That work then has to be redone in post-production, costing far more time than the planning would have.
Round 3: Big Think
- Pre-production: brief, research, script and storyboard
- Booking the location, people and equipment
- Production: filming
- Post-production: editing, sound, grading and export
- Each dependent task waits for the one before
- Checkpoints such as sign off of the storyboard or a rough cut
- Spares, a reserve date and spare days
- A Gantt chart with durations
Model answerWeek 1 is pre-production: agree the brief with the gym, research, write the script and draw the storyboard, then book the gym, the people and the equipment. The first checkpoint is the gym's sign off of the storyboard, because filming cannot start until the plan is approved. Week 2 is filming, which depends on the bookings, with a reserve shoot date and spare batteries and cards. Week 3 is editing, which can only start after filming, followed by sound and grading, with a rough cut sent for approval. Week 4 holds the final changes, the export and two spare days before the deadline. A Gantt chart would show each task's duration and the order.
- The weather could ruin the light or the day
- An indoor alternative or a reserve date
- Equipment could fail
- So spares should be packed
- A model could pull out
- A reserve person, or flexible shots taken first
- Files could be lost, so back them up during the day
- Location permission, and a conclusion
Model answerThe biggest risk outdoors is the weather: rain or poor light could ruin the day, so the photographer should plan an indoor alternative and agree a reserve date. Equipment can fail, so spare batteries, spare memory cards and ideally a second camera should be packed. A model could pull out through illness, so a reserve contributor should be available, and the most flexible shots taken first. Files could be lost or corrupted, so images should be backed up to a second device during the day. Permission for the location must be agreed in writing beforehand. Overall, each risk needs a named plan and spare time, because hoping it goes well is not contingency.
This or That
- No: it depends on filming You cannot edit footage that has not been shot.
- Tasks running in parallel Bars that start where another ends show dependencies.
- A milestone A milestone is a fixed checkpoint.
- Post-production They come after the product has been made.
- Production Pre-production plans it. Production builds it.
- No: use a version number There is always a final-final-2.
- Before it Spare time after the deadline is just being late.
- Keep the layered file The layered file is what you edit if changes are needed.
Memory Match
- A 5 Dependency: Cannot start until another task ends
- B 4 Milestone: A fixed checkpoint, often a sign off
- C 6 Contingency: Spare time or a plan B
- D 2 Gantt chart: Bars of tasks against time
- E 1 Critical path: Dependent tasks setting the shortest length
- F 3 Version control: Numbered saves that can be recovered
Sort It
- Production Photographing the products Capturing images is production.
- Production Filming the scenes Filming is production.
- Pre-production Sourcing and licensing assets Clear licences before production, not after.
- Post-production Editing the footage Editing is post-production.
- Post-production Exporting the final file Export comes at the end.
- Production Writing the app's code Building the product is production.
- Pre-production Writing the script Planning comes first.
- Production Recording the voiceover Recording is production.
- Pre-production Booking the location Booking is part of pre-production.
- Pre-production Carrying out a risk assessment Risks are assessed before production.
- Post-production Mixing the sound Mixing happens afterwards.
- Post-production Testing the product Testing is part of post-production.