KS4J834 R093 TA3 22 min read 10 question quiz 18 exam marks

R093 TA3: Work Planning and Workflow

Breaking a project into tasks, putting them in an order that works, and planning for the thing that will go wrong.

What a work plan contains

A work plan turns a project into something that can be tracked.

ElementMeaning
TaskOne unit of work with a clear finish
DurationHow long the task takes
SequenceThe order tasks happen in
DependencyA task that cannot start until another finishes
MilestoneA fixed checkpoint, often a client sign off
ResourcesThe people, equipment, software and locations needed
ContingencySpare time deliberately built in for problems
Critical pathThe chain of dependent tasks that sets the shortest possible project length

Gantt charts

Tasks down the left, time across the top, one bar per task. Overlapping bars are tasks running in parallel; bars that start where another ends are dependencies. A Gantt chart answers the two questions a client asks: what are you doing now, and will it be ready on time.

Dependency is the word that earns marks

You cannot edit footage that has not been shot, and you cannot shoot without a location booked. Saying "editing depends on filming, so filming has to finish first" shows you understand sequencing, which is what the question is testing.

A Gantt chart with dependencies, milestones and contingencyA Gantt chart for a two week video project. Tasks run down the left and days across the top, with one bar per task. Brief and research runs on days zero to two, ideas and mood board overlap it on days one to three, and the storyboard and script run on days two to four. Booking the location and crew happens on day two, and filming on days four to six, which means the booking has to be complete before filming starts. Editing runs from day six to day ten, and an arrow marks that the edit depends on filming: it cannot begin until the footage exists. Two contingency days sit on days ten to twelve, deliberately placed before the client review and delivery on days twelve to fourteen rather than at the very end, because that is where a delay cannot be absorbed. Three milestones are marked underneath: the brief signed off on day two, the rushes in on day six and client sign off on day twelve. The bars that cannot overlap, the fixed checkpoints and the spare days are what make this a work plan rather than a list of tasks.A work plan: tasks against time, with dependenciesday 0day 2day 4day 6day 8day 10day 12day 14Brief and researchIdeas and mood boardStoryboard and scriptBook location and crewFilmingEditContingencyspareClient review and deliveryedit depends on filmingbrief signed offrushes inclient sign offmilestones
A plan that finishes exactly on the deadline has no contingency in it at all.

Workflow and the production phases

Every media product moves through the same three phases, and knowing what belongs in each is examinable.

PhaseContains
Pre-productionBrief, research, ideas, planning documents, asset sourcing, scheduling, booking, risk assessment
ProductionFilming, recording, photographing, designing, building, writing code
Post-productionEditing, grading, mixing, effects, testing, review, export, distribution

Why the order cannot be rushed

Teams that skip pre-production to "get started" spend the saved time three times over in post-production, because every missing decision has to be made late, with less information and more already built on top of it.

Version control

  • Save a new version at each significant stage rather than overwriting
  • Use a naming convention that sorts correctly: poster-v03-client-review.svg
  • Never use "final" in a file name. There is always a final-final-2
  • Keep the layered working file as well as every export
  • Back up in a second location, because one copy is not a backup
Pre-production, production, post-productionThe three phases of production drawn as three floors of a building. The bottom floor is pre-production, which plans the work: the brief, the research, the shot list, the schedule and the licences for anything borrowed. The middle floor is production, which makes it: filming, recording, designing and building. The top floor is post-production, which finishes it: editing, mixing, grading and testing before the export. Each floor hands something specific to the one above it, and those handovers are dependencies: pre-production hands production a shot list, and production hands post-production the footage. That is why the order cannot be rearranged. A bar chart on the right shows what happens when planning is skipped: the same change costs a little at the planning stage, more once it has been shot, and most of all in the edit, because every decision that should have been made early has to be made late with more already built on top of it.Post-productionfinishes itProductionmakes itPre-productionplans itbriefresearchshot listschedulelicencesfilmingrecordingdesigningbuildingeditingmixinggradingtestingshot listfootageCost of change£plan££shoot£££editSkip the ground floor andthe decisions arrive late,with more built on top.12345
  1. Pre-production plans it: brief, research, documents, schedule, licences.
  2. Production makes it: filming, recording, designing, building.
  3. Post-production finishes it: editing, mixing, testing, export.
  4. Each floor hands something specific to the one above it.
  5. Skip the bottom floor and the decisions do not disappear: they arrive late.
Each phase exists to hand the next one something. That is the whole reason for the order.

Risk, contingency and resources

Risks worth planning for

RiskTypical contingency
Equipment failureSpare battery, spare card, a second camera
A contributor pulling outA reserve interviewee; shoot the flexible material first
WeatherAn indoor alternative and a reserve date
Software or file corruptionVersioned saves and an off site backup
An asset turning out to be unlicensedClear licences before production, not after
Underestimated edit timeContingency days before the deadline, not after

Resources

  • People and their availability, which is usually the real constraint
  • Equipment, booked rather than assumed
  • Locations, with permission in writing
  • Software and hardware, with the version checked
  • Time, which is the only one that cannot be bought more of
Contingency is not optimism

"I would work faster" is not contingency. Contingency is naming a specific risk, saying what you would do instead, and putting the spare time in the plan where it is needed. A plan that finishes exactly on the deadline has no contingency at all.

A risk matrix of likelihood against impact for a film shoot, with a contingency for each riskA risk matrix plots how likely a risk is against how bad it would be. Four risks for a film shoot are placed on it. A flat battery is likely but low impact. Rain is medium on both. An actor being ill is medium likely and high impact. Lost files are less likely but high impact. For each risk a contingency, a plan B, is listed: a reserve actor or a second shooting day for illness, spare batteries and a charger, an indoor backup location for rain, and backups on two drives for lost files.Risk matrix1highmediumlowlowmediumhighimpact if it happenslikelihoodLost filesActor illRainFlat batteryContingency: the plan B2Actor illa reserve actor, or a secondshooting dayFlat batteryspare batteries and a chargerRainan indoor backup locationLost filesbackups on two drives
  1. Plot each risk by how likely it is and how much damage it would do. Plan most carefully for the top right.
  2. Every risk gets a contingency, a plan B, written down before the shoot.
A work plan is only complete if it names the risks and says what you will do when one happens.

Key terms you must be able to define

Work plan
A schedule of tasks, durations, dependencies, milestones and resources for a project.
Gantt chart
A bar chart of tasks against time, showing sequence, overlap and dependencies.
Dependency
A task that cannot begin until another has finished.
Milestone
A fixed checkpoint in a project, often a client sign off.
Contingency
Spare time or an alternative plan deliberately built in for problems.
Critical path
The sequence of dependent tasks that determines the shortest possible project duration.
Version control
Keeping numbered versions of files so earlier states can be recovered.

Flashcards

Say the definition out loud before you flip the card. Retrieving it from memory is what builds recall, reading it again is not.

DefineWork plan
AnswerA schedule of tasks, durations, dependencies, milestones and resources for a project.
DefineGantt chart
AnswerA bar chart of tasks against time, showing sequence, overlap and dependencies.
DefineDependency
AnswerA task that cannot begin until another has finished.
DefineMilestone
AnswerA fixed checkpoint in a project, often a client sign off.
DefineContingency
AnswerSpare time or an alternative plan deliberately built in for problems.
DefineCritical path
AnswerThe sequence of dependent tasks that determines the shortest possible project duration.
DefineVersion control
AnswerKeeping numbered versions of files so earlier states can be recovered.

Reach the top grade on this topic

Answers reach the top band by being specific to the product described. Not "you need a work plan to stay organised" but "filming is on day four, so the location permission and the contributor confirmation have to be milestones on day two, and the two contingency days belong before the client review rather than after it."

Mistakes that cost marks here

Avoid these
  • Listing tasks with no durations, order or dependencies, which is a to do list rather than a work plan.
  • Planning to finish exactly on the deadline, which leaves no contingency at all.
  • Calling 'working harder' a contingency plan.
  • Putting post-production tasks in the production phase.
  • Overwriting one file throughout instead of keeping versions.
  • Using 'final' in a filename.
Fun fact

The critical path method was developed in the 1950s for building chemical plants and launching missiles. The same maths now decides whether a two minute YouTube video gets finished on time.

Knowledge check

0 of 10 answered
1What is a dependency in a work plan?
2What does a Gantt chart show?
3Which of these is genuine contingency planning?
4In which phase does colour grading happen?
5Why should 'final' never appear in a file name?
6What is a milestone?
7Which is the real constraint on most small productions?
8What is the critical path?
9Risk assessment belongs in which phase?
10Why keep the layered working file as well as the export?
Score 0 / 10

Exam-style questions

Five written questions in the style of the real paper. Write a full answer, then let the marker check it against the mark scheme.

18 marks
1Identify three things that should be included in a work plan.3 marks
Identify

Mark scheme0 / 3
  • LTasks
  • LDurations or deadlines
  • LDependencies, milestones, resources or contingency
Model answer

The tasks to be completed, the duration of each, and the dependencies showing which tasks must finish before others can begin.

The marker looks for key phrases. If you said it another way and it is still right, give yourself the mark.
2Explain why dependencies must be identified when planning a video production.3 marks
Explain

Mark scheme0 / 3
  • LA dependency means one task cannot start until another finishes
  • LA relevant example from video production
  • LThe consequence of getting it wrong
Model answer

A dependency is a task that cannot begin until another has finished, and in a video production the chain is strict: the script has to exist before the storyboard, the storyboard before the shoot, and the footage before any editing. Identifying these means the schedule puts them in a workable order and the resources are booked for the right days. If they are missed, an editor is booked for a week in which no footage exists, which wastes the booking and pushes the whole project past its deadline, because every later task sits behind the delay.

The marker looks for key phrases. If you said it another way and it is still right, give yourself the mark.
3A student has four weeks to produce a two minute promotional video for a local business. Filming must take place on location at the business.Describe two risks to this project and give a suitable contingency for each.4 marks
Describe

Mark scheme0 / 4
  • LA genuine risk is identified
  • LA specific, workable contingency for it
  • LA second, different risk
  • LA specific contingency for the second
Model answer

One risk is that the business turns out to be too busy or too noisy on the filming day, so usable audio cannot be recorded. The contingency is to agree a reserve date before the first one and to record a clean voiceover separately, so the project does not depend on usable location sound. A second risk is losing the footage to a corrupted memory card, which would be unrecoverable within four weeks. The contingency is to copy the card to two separate drives on the day of the shoot before the card is reused, so no single failure can destroy the only copy.

The marker looks for key phrases. If you said it another way and it is still right, give yourself the mark.
4A small agency has six weeks to deliver a campaign consisting of a printed poster, a 30 second social media video and a landing page.Discuss how the agency should plan and sequence this work, and explain the consequences of planning it badly.8 marks
Discuss

Mark scheme0 / 8
  • LTasks are broken down across the three deliverables
  • LDependencies between tasks are identified
  • LParallel work is identified where possible
  • LA shared asset or brand decision is recognised as coming first
  • LMilestones or client sign off points are placed
  • LThe print deadline is treated as fixed
  • LContingency is included and justified
  • LConsequences of poor planning are explained with a judgement
Model answer

The first move is to separate the work into tasks per deliverable and then look for what they share, because the three products are not independent: all of them need the same palette, typography and photography, so the brand decisions and a single photo shoot should sit at the front of the plan and feed all three. That turns one shoot into assets for the poster, the video and the page instead of three separate pieces of production. After that, dependencies set the order. The poster cannot be artworked until the images and the headline are approved, the video cannot be edited until the footage exists, and the landing page cannot be built until the copy and assets are ready, although the page's structure can be wireframed in parallel with filming because it does not depend on the footage. Printing is the hardest constraint in the whole plan: a printer needs files several days before delivery and will not accept late changes, so the print sign off milestone has to be set roughly a week before the campaign date and everything upstream of it scheduled backwards from there. The video and the page are more forgiving, since both can be updated after publication. Milestones belong at the points where a mistake would be expensive: brand sign off before any artwork, image approval before artworking, and a final client review before the print file is sent. Contingency of three or four days should sit immediately before the print deadline rather than at the end of the project, because that is where a delay cannot be absorbed. Planned badly, the likely failures are predictable: a shoot run after artwork has started, so the images do not fit the layout; the page and the poster using different colours because the brand decisions were made twice; and most seriously the print file arriving late, which cannot be solved with extra effort because the printer's schedule is outside the agency's control. That is the consequence worth emphasising, since the video and the page can be fixed after release and the poster cannot be fixed at all once it is printed.

The marker looks for key phrases. If you said it another way and it is still right, give yourself the mark.
Machine mark 0 / 18